Tracks
S. NO. | CRITERIA | DIMENSION |
1. | Gauge | 1435 mm |
2. | Design speed Max. operating speed | 90 Kmph 80 Kmph |
3. | Max. axle load, loaded condition | 17 tonne |
4. | Maximum Gradient Normal / desirable Limit Exceptional Limit | 2.5% 4% |
5. | Sharpest vertical curve radius Sharpest horizontal curve radius | 1500m 120 m (main line track) 90 m (depot track |
6. | Traction power collection | Overhead Catenary system (OCS) at 25kV(AC) |
7. | Inclination of Rail | 1 in 40 |
8. | Wheel tread profile | UIC 510-2 (S1002); to be interfaced with Rolling Stock |
9. | Rail profile | UIC 60 (861-3) |
Depots
Two depots 69.2 km rail network of Hyderabad Metro Rail are located at:
- Miyapur for Corridor 1 (Miyapur –LB Nagar)
- Uppal for Corridor 3 (Raidurg – Nagole)
The Uppal depot is the main depot cum workshop where the overhaul and corrective maintenance facilities for whole fleet are done. The other two depots have basic facilities for scheduled preventive maintenance and minor corrective maintenance.
Signalling and Train Control System
- The advanced signalling & Train Control technology, Communication Based Train Control (CBTC), is adopted for Hyderabad Metro to control the trains. Hyderabad Metro is the first Metro in India to claim train control by CBTC technology. The trains running on three corridors are controlled and monitored from state-of-the-art Operation Control Centre (OCC) at Uppal.
- The trains can run with headway of 90 Sec to cater to commuters during office peak hours in morning and in evening. The overview display panels are mimic of all three corridors and indicate current locations of all trains running on these corridors. The OCC is the primary control centre having a back-up control centre at Uppal depot to take over the operation if the OCC to be evacuated due to unforeseen situation.
- Local ATS at station and VDU at interlocking station can also control the train when needed. Axle Counter based Fall-Back system is also adopted as secondary train detection system in all three corridors in unlikely event of failure of CBTC operation.
- There are two major depots at Uppal and Miyapur. These depots are controlled and monitored from independent control centres at Uppal and Miyapur respectively. The signalling at these depots is based on redundant Computer Based Interlocking (CBI) system.
- Test track at the Uppal depot is to facilitate testing of trains before putting them in to the passenger operation to ensure safe and reliable train operation.
- The trains run on Automatic Train Operation (ATO) mode which is the normal mode of operation of trains. The Automatic Train Protection (ATP) system continuously monitors safe train operation and initiates necessary action if a train doesn’t perform as desired.
- There are other degraded modes of train operation such as ATP mode, RM mode and Cut out mode which are selected as and when needed. All vital train borne equipments are highly safe and redundant to avoid any unwanted interruption of train service.
- The station equipments e.g., Computer Based Interlocking (CBI), wayside ATP etc., are vital signalling equipments and redundantly arranged to ensure safe and uninterrupted train operation. Passenger Emergency Stop Plungers are provided on each platform and in Station Control Room (SCR) to stop a train immediately in case of emergency.
MEP
Station Concept: ELECTRCAL LOW VOLTAGE SYSTEM
Low Voltage Power Distribution System |
|
Lighting System |
|
Essential Power Supply (DG Set) |
|
Emergency Power Supply (UPS) |
|
Earthing System |
|
Low Voltage Cables |
|
Building Management System |
|
Elevator |
|
Escalator |
|
Electrical High Voltage System: For 25 KV Traction
FIRE DETECTION AND SUPPRESION SYSTEM
Fire detection and Suppression System | Fire Detection & Alarm System of Analogue Addressable type has been provided in all stations to detect the presence of fire and initiate the Fire Suppression action through Fire Hydrant system and Automatic Sprinkler System to provide protection from Fire. |
Clean Gas flooding fire suppression system | Gas Flooding Systems have been installed in all Stations to protect critical Rail System equipment from fire |
Co2 based internal gas suppression system | CO2 Fire trace system is provided to extinguish the fire inside the Critical Power Supply Panels which are located in Sub-Station. |